Control room handover template

What a control room handover has to contain so the incoming controller is not starting from zero.

Details

Last revised
10/02/2026
Reading time
4 min
Cost
Free, no email required

A handover is not a summary of the shift. It is everything the next person needs to make the next decision.

What it contains

  • Open entries, by reference, with what is being waited on.
  • Anything monitoring rather than closed, and the trigger that would escalate it.
  • Current capacity figure and direction of travel.
  • Staffing state: positions covered, gaps, breaks outstanding.
  • Checks due in the next hour and any currently overdue.
  • Decisions taken this shift that constrain the next one.
  • Outstanding external commitments — police, medical, licensing, promoter.

Signed by both

Outgoing and incoming both sign, with the time. A handover nobody accepted is a handover that did not happen.