What should be settled before doors open, in the order it usually goes wrong at a UK event.

Details

Last revised
10/02/2026
Reading time
5 min
Cost
Free, no email required

Ordered by what causes the most trouble when it is missed, rather than by department.

Before doors

  • Licence conditions transcribed into the checks that will actually be run, with intervals set.
  • Call signs issued, radios tested and counted, channels confirmed, spares held.
  • Capacity figures and the counting method agreed with whoever will be asked for them.
  • Wind and weather thresholds taken from each structure's own supplier plan, not a standard number.
  • Staffing minimums per position, and who is authorised to stand a shortfall down.
  • Medical, welfare and lost property arrangements, and where each register lives.
  • Escalation: who is called, at what point, on what number, and who deputises.
  • Control room contact list printed as well as stored.

At doors

  • First radio roll call completed and any non-responding call sign resolved.
  • Counting started and the first figure recorded, so the baseline exists.
  • Log opened with the event start entry, naming the controller on duty.

During

  • Check rounds run on interval and recorded, including the misses.
  • Handover written at every change of controller, from the record.
  • Any variation to the plan logged as a decision with a name against it.